





Recycling Center V1.0
Lift can be driven up and down at the Reception Building, to make it easier to Unload Semitrailers / Trailers. Lighting switches itself automatically On and Off
Attention: a lot of free building space is required.
Important: β Only use grid placement.
DO NOT use free mode, otherwise it will not be possible to tip over at the top.
β Price: 250,000 $
β Daily maintenance: 15 $